top of page
Konstruktiv
1/3
Constructive
Finger pier - Gebr. Friedrich Werft - Kiel
-
Replacement construction of a 1,500 m² pier in cofferdam construction
-
Installation of approx. 7,500 m³ of harbor sediment and conditioning to bind pollutants
-
Mobile crane use with up to 250 tons
-
Comprehensive ecological construction supervision and marine mammal protection concept
KüstenIng
Coastal engineering
Beach renovation
& groyne construction - Olpenitz
-
Hydro-numeric modeling of flow behavior in the vicinity of the beach
-
Nourishment of 7,000 m³ to 3,700 m²
-
Reconstruction of the groyne and extension to around 25m
-
Over 400 tons of built armourstones
1/4
Hafenplanung
Port planning
Yacht club harbor - Olpenitz
-
Hydraulic fill using 600,000 m³ sand
-
300 m breakwater and 450 m slope stabilization
-
installation of footbridges offering 58 berths
-
planning and construction supervision of Yachtclubhafen
PBB
SPBB -
Sea Passenger Boarding Bridges
Baltic Sea Terminal - Kiel
-
Design of a passenger boarding bridge and preparing the tender documents
-
max. lifting height of 17 m
-
client mentoring during installation phase
SPBB
Sea Pasenger Boarding Bridges
SPBB
Sea Pasenger Boarding Bridges
SPBB
Sea Pasenger Boarding Bridges
1/2
Nature-orientated hydraulic
engineering
Renaturations
-
Nature-orientated reconstruction of river Schlinz, Altengammer Vorland
Rehydration of moors
-
Restoration of a wet moor, Ekel, Erfde Kreis Schleswig-Flensburg
RENAT
Flood prevention
Municipal consulting
Planning
-
Improvement of flood prevention, Mönkeberg promenade
HWS
bottom of page