top of page
Konstruktiv

Constructive
Finger pier - Gebr. Friedrich Werft - Kiel

  • Replacement construction of a 1,500 m² pier in cofferdam construction

  • Installation of approx. 7,500 m³ of harbor sediment and conditioning to bind pollutants

  • Mobile crane use with up to 250 tons

  • Comprehensive ecological construction supervision and marine mammal protection concept

KüstenIng

Coastal engineering
Beach renovation
& groyne construction - Olpenitz

  • Hydro-numeric modeling of flow behavior in the vicinity of the beach
  • Nourishment of 7,000 m³ to 3,700 m²
  • Reconstruction of the groyne and extension to around 25m
  • Over 400 tons of built armourstones
Hafenplanung
port planning, Hafenplanung

Port planning
Yacht club harbor - Olpenitz

  • Hydraulic fill using 600,000 m³ sand
  • 300 m breakwater and 450 m slope stabilization
  • installation of footbridges offering 58 berths
  • planning and construction supervision of Yachtclubhafen
PBB

SPBB -
Sea Passenger Boarding Bridges
Baltic Sea Terminal - Kiel

  • Design of a passenger boarding bridge and preparing the tender documents
  • max. lifting height of 17 m
  • client mentoring during installation phase

Nature-orientated hydraulic
engineering

Renaturations

  • Nature-orientated reconstruction of river Schlinz, Altengammer Vorland

Rehydration of moors 

  • Restoration of a wet moor, Ekel, Erfde Kreis Schleswig-Flensburg
RENAT

Flood prevention
Municipal consulting

Planning

  • Improvement of flood prevention, Mönkeberg promenade
HWS
bottom of page